Skip to content

A bill of quantities does not end at a page break.

The public beta reads bills of quantities with selectable PDF text. It shows items with their source pages, records corrections and creates GAEB X83/X84 after review. AI approaches are researched separately.

Illustrative review of a digital bill of quantities
Fictional Werkraum project with four fit-out items, full descriptions, quantities and unit prices.
Fictional source · 1 PDF page

One bill of quantities. Two exchange phases.

X83 contains specifications and quantities. The matching X84 contains bid prices. Item identifiers connect the two files.

Manually reviewed fictional bill of quantities, not measured AI output
Item Quantity Unit price
01.01.0010Wandflächen vorbereiten 24.000m² 8.500 EUR
01.01.0020Wandanstrich ausführen 24.000m² 14.750 EUR
01.01.0030Sockelleisten montieren 18.500m 11.200 EUR
01.01.0040Abschlusskontrolle 1.000St 45.000 EUR

4 items · EUR 810.20 bid total excluding VAT · X83 and X84 validated against GAEB XSD.

{
  "bidder": "Fiktiver Musterbetrieb",
  "bidder_city": "Musterort",
  "bidder_postcode": "00000",
  "bidder_street": "Beispielstraße 1",
  "currency": "EUR",
  "document_sha256": "91faa4998e3dba7aeeaae66d4dd78f873c16ea46226d25b35e5689f37dc7609d",
  "issues": [],
  "lv_id": "DEMO-WERKRAUM",
  "name": "Fiktives Referenzbeispiel, manuell übertragen",
  "nodes": [
    {
      "alternative_group": null,
      "alternative_rank": null,
      "complements": [],
      "field_sources": {},
      "id": "title01",
      "include_in_total": null,
      "issues": [],
      "item_type": "normal",
      "kind": "heading",
      "long_text": "",
      "oz": "01",
      "parent_id": null,
      "parent_oz": null,
      "quantity": null,
      "short_text": "Ausbau",
      "sources": [],
      "unit": null,
      "unit_price": null
    },
    {
      "alternative_group": null,
      "alternative_rank": null,
      "complements": [],
      "field_sources": {},
      "id": "title0101",
      "include_in_total": null,
      "issues": [],
      "item_type": "normal",
      "kind": "heading",
      "long_text": "",
      "oz": "01.01",
      "parent_id": "title01",
      "parent_oz": "01",
      "quantity": null,
      "short_text": "Oberflächen",
      "sources": [],
      "unit": null,
      "unit_price": null
    },
    {
      "alternative_group": null,
      "alternative_rank": null,
      "complements": [],
      "field_sources": {},
      "id": "item0010",
      "include_in_total": null,
      "issues": [],
      "item_type": "normal",
      "kind": "item",
      "long_text": "Lose Beschichtungen entfernen und den Untergrund trocken reinigen.\nAnschlüsse an Fenster und Türen sorgfältig abkleben. Staub und Restmaterial fachgerecht aufnehmen.",
      "oz": "01.01.0010",
      "parent_id": "title0101",
      "parent_oz": "01.01",
      "quantity": "24.000",
      "short_text": "Wandflächen vorbereiten",
      "sources": [
        {
          "bbox": null,
          "line_ids": [],
          "method": "manual_reference",
          "page": 1
        }
      ],
      "unit": "m2",
      "unit_price": "8.500"
    },
    {
      "alternative_group": null,
      "alternative_rank": null,
      "complements": [],
      "field_sources": {},
      "id": "item0020",
      "include_in_total": null,
      "issues": [],
      "item_type": "normal",
      "kind": "item",
      "long_text": "Zweifacher Anstrich mit weißer Innenwandfarbe auf vorbereitetem Untergrund.\nDie Fläche muss nach dem Trocknen gleichmäßig deckend sein. Abklebungen entfernen und die Arbeitsstelle sauber übergeben.",
      "oz": "01.01.0020",
      "parent_id": "title0101",
      "parent_oz": "01.01",
      "quantity": "24.000",
      "short_text": "Wandanstrich ausführen",
      "sources": [
        {
          "bbox": null,
          "line_ids": [],
          "method": "manual_reference",
          "page": 1
        }
      ],
      "unit": "m2",
      "unit_price": "14.750"
    },
    {
      "alternative_group": null,
      "alternative_rank": null,
      "complements": [],
      "field_sources": {},
      "id": "item0030",
      "include_in_total": null,
      "issues": [],
      "item_type": "normal",
      "kind": "item",
      "long_text": "Sockelleisten aus Holz liefern, ablängen und befestigen. Gehrungen an Ecken herstellen.\nSichtbare Oberflächen dürfen keine offenen Befestigungslöcher aufweisen.",
      "oz": "01.01.0030",
      "parent_id": "title0101",
      "parent_oz": "01.01",
      "quantity": "18.500",
      "short_text": "Sockelleisten montieren",
      "sources": [
        {
          "bbox": null,
          "line_ids": [],
          "method": "manual_reference",
          "page": 1
        }
      ],
      "unit": "m",
      "unit_price": "11.200"
    },
    {
      "alternative_group": null,
      "alternative_rank": null,
      "complements": [],
      "field_sources": {},
      "id": "item0040",
      "include_in_total": null,
      "issues": [],
      "item_type": "normal",
      "kind": "item",
      "long_text": "Alle bearbeiteten Flächen gemeinsam begehen. Kleine Fehlstellen unmittelbar nacharbeiten.\nEin kurzes Protokoll mit Datum und ausgeführten Nacharbeiten übergeben.",
      "oz": "01.01.0040",
      "parent_id": "title0101",
      "parent_oz": "01.01",
      "quantity": "1.000",
      "short_text": "Abschlusskontrolle",
      "sources": [
        {
          "bbox": null,
          "line_ids": [],
          "method": "manual_reference",
          "page": 1
        }
      ],
      "unit": "St",
      "unit_price": "45.000"
    }
  ],
  "page_count": 1,
  "processing_complete": true,
  "project": "Musterprojekt Werkraum",
  "review_status": "synthetic_manual_reference",
  "reviewed": true,
  "schema_version": "lv-1.0"
}
<?xml version='1.0' encoding='UTF-8'?>
<GAEB xmlns="http://www.gaeb.de/GAEB_DA_XML/DA83/3.3">
  <GAEBInfo>
    <Version>3.3</Version>
    <VersDate>2021-05</VersDate>
    <Date>2026-09-08</Date>
    <ProgSystem>Bettag Systems</ProgSystem>
    <ProgName>LV-Konvertierung</ProgName>
  </GAEBInfo>
  <PrjInfo>
    <NamePrj>Musterprojekt Werkraum</NamePrj>
    <Cur>EUR</Cur>
  </PrjInfo>
  <Award>
    <DP>83</DP>
    <BoQ ID="b91faa4998e3dba7aeeaae66d">
      <BoQInfo>
        <Name>DEMO-WERKRAUM</Name>
        <LblBoQ>Musterprojekt Werkraum</LblBoQ>
        <OutlCompl>AllTxt</OutlCompl>
        <BoQBkdn>
          <Type>BoQLevel</Type>
          <Length>2</Length>
          <Num>Yes</Num>
        </BoQBkdn>
        <BoQBkdn>
          <Type>BoQLevel</Type>
          <Length>2</Length>
          <Num>Yes</Num>
        </BoQBkdn>
        <BoQBkdn>
          <Type>Item</Type>
          <Length>4</Length>
          <Num>Yes</Num>
        </BoQBkdn>
      </BoQInfo>
      <BoQBody>
        <BoQCtgy ID="ntitle01" RNoPart="01">
          <LblTx>
            <span>Ausbau</span>
          </LblTx>
          <BoQBody>
            <BoQCtgy ID="ntitle0101" RNoPart="01">
              <LblTx>
                <span>Oberflächen</span>
              </LblTx>
              <BoQBody>
                <Itemlist>
                  <Item ID="nitem0010" RNoPart="0010">
                    <Qty>24.000</Qty>
                    <QU>m2</QU>
                    <Description ID="e5c3c8c11ec758b791cd120b1468e7b3">
                      <CompleteText>
                        <DetailTxt>
                          <Text>
                            <p>
                              <span>Lose Beschichtungen entfernen und den Untergrund trocken reinigen.</span>
                              <br/>
                              <span>Anschlüsse an Fenster und Türen sorgfältig abkleben. Staub und Restmaterial fachgerecht aufnehmen.</span>
                            </p>
                          </Text>
                        </DetailTxt>
                      </CompleteText>
                    </Description>
                  </Item>
                  <Item ID="nitem0020" RNoPart="0020">
                    <Qty>24.000</Qty>
                    <QU>m2</QU>
                    <Description ID="b641721ff4f15759b6480d1cfbb64b67">
                      <CompleteText>
                        <DetailTxt>
                          <Text>
                            <p>
                              <span>Zweifacher Anstrich mit weißer Innenwandfarbe auf vorbereitetem Untergrund.</span>
                              <br/>
                              <span>Die Fläche muss nach dem Trocknen gleichmäßig deckend sein. Abklebungen entfernen und die Arbeitsstelle sauber übergeben.</span>
                            </p>
                          </Text>
                        </DetailTxt>
                      </CompleteText>
                    </Description>
                  </Item>
                  <Item ID="nitem0030" RNoPart="0030">
                    <Qty>18.500</Qty>
                    <QU>m</QU>
                    <Description ID="16163a6edcac5d7d9ecb903d99f34c02">
                      <CompleteText>
                        <DetailTxt>
                          <Text>
                            <p>
                              <span>Sockelleisten aus Holz liefern, ablängen und befestigen. Gehrungen an Ecken herstellen.</span>
                              <br/>
                              <span>Sichtbare Oberflächen dürfen keine offenen Befestigungslöcher aufweisen.</span>
                            </p>
                          </Text>
                        </DetailTxt>
                      </CompleteText>
                    </Description>
                  </Item>
                  <Item ID="nitem0040" RNoPart="0040">
                    <Qty>1.000</Qty>
                    <QU>St</QU>
                    <Description ID="f7eaaa6cc8715f89a0226d02ef343515">
                      <CompleteText>
                        <DetailTxt>
                          <Text>
                            <p>
                              <span>Alle bearbeiteten Flächen gemeinsam begehen. Kleine Fehlstellen unmittelbar nacharbeiten.</span>
                              <br/>
                              <span>Ein kurzes Protokoll mit Datum und ausgeführten Nacharbeiten übergeben.</span>
                            </p>
                          </Text>
                        </DetailTxt>
                      </CompleteText>
                    </Description>
                  </Item>
                </Itemlist>
              </BoQBody>
            </BoQCtgy>
          </BoQBody>
        </BoQCtgy>
      </BoQBody>
    </BoQ>
  </Award>
</GAEB>
<?xml version='1.0' encoding='UTF-8'?>
<GAEB xmlns="http://www.gaeb.de/GAEB_DA_XML/DA84/3.3">
  <GAEBInfo>
    <Version>3.3</Version>
    <VersDate>2021-05</VersDate>
    <Date>2026-09-08</Date>
    <ProgSystem>Bettag Systems</ProgSystem>
    <ProgName>LV-Konvertierung</ProgName>
  </GAEBInfo>
  <PrjInfo>
    <NamePrj>Musterprojekt Werkraum</NamePrj>
  </PrjInfo>
  <Award>
    <DP>84</DP>
    <CTR>
      <Address>
        <Name1>Fiktiver Musterbetrieb</Name1>
        <Street>Beispielstraße 1</Street>
        <PCode>00000</PCode>
        <City>Musterort</City>
      </Address>
    </CTR>
    <BoQ ID="b91faa4998e3dba7aeeaae66d">
      <BoQInfo>
        <Name>DEMO-WERKRAUM</Name>
        <BoQBkdn>
          <Type>BoQLevel</Type>
          <Length>2</Length>
          <Num>Yes</Num>
        </BoQBkdn>
        <BoQBkdn>
          <Type>BoQLevel</Type>
          <Length>2</Length>
          <Num>Yes</Num>
        </BoQBkdn>
        <BoQBkdn>
          <Type>Item</Type>
          <Length>4</Length>
          <Num>Yes</Num>
        </BoQBkdn>
        <Totals>
          <Total>810.20</Total>
        </Totals>
      </BoQInfo>
      <BoQBody>
        <BoQCtgy ID="ntitle01" RNoPart="01">
          <BoQBody>
            <BoQCtgy ID="ntitle0101" RNoPart="01">
              <BoQBody>
                <Itemlist>
                  <Item ID="nitem0010" RNoPart="0010">
                    <UP>8.500</UP>
                    <IT>204.00</IT>
                  </Item>
                  <Item ID="nitem0020" RNoPart="0020">
                    <UP>14.750</UP>
                    <IT>354.00</IT>
                  </Item>
                  <Item ID="nitem0030" RNoPart="0030">
                    <UP>11.200</UP>
                    <IT>207.20</IT>
                  </Item>
                  <Item ID="nitem0040" RNoPart="0040">
                    <UP>45.000</UP>
                    <IT>45.00</IT>
                  </Item>
                </Itemlist>
              </BoQBody>
              <Totals>
                <Total>810.20</Total>
              </Totals>
            </BoQCtgy>
          </BoQBody>
          <Totals>
            <Total>810.20</Total>
          </Totals>
        </BoQCtgy>
      </BoQBody>
    </BoQ>
  </Award>
</GAEB>

Manually transcribed reference of a fictional German bill of quantities. Bidder details are also fictional. This example verifies export behavior, not model extraction quality.

Problem and role

Readable PDF, missing structure

A bill of quantities contains headings, item numbers, full descriptions and quantities. An item may continue on the next page; provisional and alternative items have their own rules. Copying table cells can produce structurally valid data with an incomplete scope of work.

Built by Franz Bettag

Independent development of document preparation, model integration, the structured bill-of-quantities model, review interface, resumable processing and GAEB export. The published documents are independently authored fictional examples.

The public demo workflow

Prepare PDF and text evidence

The demo processes the existing text layer on CPU. It requires neither a Hugging Face account nor GPU quota. Scans, photographs and handwriting are not recognised. Pages without readable text and documents without recognised items stop processing with an explanation.

Reconstruct the bill of quantities

A text parser identifies headings, item numbers, descriptions and quantities. The two-page fictional example demonstrates a continuing item with both source pages. Other layouts can produce omissions or incorrect assignments, so review must also establish completeness.

Compare extraction approaches

Private research includes Qwen3-VL and LightOnOCR. The public text-parser demo is not a fine-tuning result. A reliable quality assessment requires independent document groups that were not used for optimisation before evaluation.

Review, confirm, export

The review interface exposes quantities, units, prices and full descriptions with their sources. Changes are logged and invalidate earlier exports. GAEB export requires complete processing, explicit review confirmation and no unresolved issues.

Treat X83 and X84 separately

The exporter writes GAEB DA XML 3.3 using the 2021-05 bill-of-quantities package and validates against its XSD schemas. X83 carries the specification; X84 carries the bid. An existing original X83 can be used to check identity, items, quantities, units and descriptions.

What can already be demonstrated

4 items, 2 matching files

The manually transcribed reference generates X83 and X84 with four items and matching item identifiers. X83 retains all four full descriptions. X84 contains bid prices and the calculated total of EUR 810.20 excluding VAT. Both files pass schema validation.

Export boundaries checked

The local check confirmed that missing review confirmation, incomplete processing and unresolved assignment issues each prevent export. This verifies those export rules. It does not measure AI extraction accuracy or compatibility with every estimating application.

Status and next measurement

The public beta demonstrates extraction, source review, correction and export using fictional examples. Independent quality acceptance for real customer documents is pending. No extraction accuracy or time savings are promised. A customer pilot also verifies import into the intended estimating software.

Evidence and next steps

Inspect source and exports

The reference bundle contains the fictional source, manually reviewed JSON, X83, X84 and an export report with checksums. Bidder details are additional fictional example values. The bundle is a reproducible export demonstration, not a model benchmark.

Illustrative review of a digital bill of quantities

Security inquiry

Request a non-binding quote for a pentest package or custom reverse engineering. We agree scope, start date and terms with you personally.

Pentest prices are per month, excluding VAT. All prices are starting prices. The final monthly fee depends on the number and extent of the agreed scopes and may be higher. Your quote confirms the binding price.

Do not send passwords, credentials, confidential vulnerability details or firmware files. We will agree secure exchange and testing authorization personally.

Privacy notice

This inquiry is non-binding. After submitting, please confirm your email address.